- When does the Contract Manager (CM) use an on-call contract and subsequent task orders type contract?
Work Breakdown Structure (WBS) Level 6 or lower
Can be used at any WBS Level
WBS Level 4 or lower
WBS Level 2 or lower
-
The CM uses project-specific contracts when the project can be specifically defined. Under which category or categories can a project-specific contract fit?
Task order-based
Multi-component
Single-component
All the above
- When developing a scope of work, it is permissible to have the same scope of work in two separate on-call contracts covering the same geographic region. (True or False)
True
False
-
In a project-specific contract, what does the detailed scope of work provide?
No specific project site
No specific route
A basis for the consultant's cost proposal and for the negotiations
No milestone chart for delivery
- Of the below answers, which one does not meet the characteristics of a state estimate?
Includes direct hours, fringe benefits, and overhead
Is called the Workload Justification or Director's Estimate
Can be shared with the consultants
Contract Manager develop the estimate
- When creating an estimate for multi-year contracts, what must be added to the estimate?
Consumer Price Index (CPI)
Yearly escalation factor
Producer Price Index (PPI)
Only direct labor costs
- When does Caltrans use the Disadvantages Business Enterprise (DBE) goals in solicitations and contracts?
Federal funded acquisitions
State funded acquisitions
- Caltrans is currently using what percentage DBE goal and using both race conscious and race neutral measures. Note: Since goals are always in a state of change, always contact DPAC for the most current goals to be used.
13.5%
5%
12.5%
10%
- What is the state's Disabled Veteran Business Enterprise (DVBE) participation goals?
13.5%
5%
12.5%
10%
- For a typical contract, the contract term should not exceed ______ years.
Five
Three
Ten
Two